The Niagara Falls Bridge Commission has the responsibility to maintain the operational and structural integrity of the Lewiston-Queenston Bridge. 

Any vehicle that exceed the following dimensions must complete a Truck Loads Program (TLP) and submit to the NFBC at least 48 hours prior to intended crossing date.

1.) OVERALL WIDTH:     11' wide and over
2.) OVERALL HEIGHT:   15'
3.) GROSS WEIGHT:      Over 130,000lbs
4.) OVERALL LENGTH:  60' and over (Maximum length is dependent upon width)

ALL TRUCK LOADS PROGRAM (TLP) APPLICATIONS MUST BE SUBMITTED 48 HOURS PRIOR TO THE INTENDED CROSSING DATE

Submit your completed TLP to the Operations Centre by
FAX: 1-905-353-6698 or 1-716-205-0698
or
EMAIL: CommServices@niagarafallsbridges.com

Click here for our TLP

PLEASE ALLOW A MINIMUM OF THREE (3) HOURS FOR PROCESSING


Attention: Eastbound and Westbound Travel Restrictions
Due to construction by the Ministry of Transportation (MTO) on the 405, please note that both Eastbound and Westbound lanes are currently restricted to a maximum width of 11 feet 4 inches.

For further details and updates, we recommend visiting 511 Ontario.  Click Here